Diesel Day 2010-04-17 (Toronto Datacenter) * 151 Front Street will be performing their annual building shut down. *

During the hours: 05:00hrs until 21:00hrs Local time at the site, on Saturday, April 17, 2010

During the above maintenance window, all commercial power to the building will be disconnected for maintenance and upgrades. All suites will transfer to Generator Power for the duration of the window.

**NO SERVICE INTERUPTION IS EXPECTED, HOWEVER, THE ENTIRE BUILDING WILL BE ON GENERATOR POWER ONLY DURING THE ABOVE NOTED MAINTENAINCE WINDOW. ANY DISRUPTION TO THE GENERATOR(S) MAY CAUSE A LOSS OF POWER TO THE CUSTOMERS CONNECTED TO THE SAME. **

Unless otherwise indicated, the scope of work to be performed by the building will include:
- Replace 600 volt cell for switch board 275
- Add an additional 13.8kv cell, located in the main hydro vault
- Alter H/V transformer traps for TX 174 and TX175
- Rack out L.B.S. A1 and A2
- High voltage testing to all main switchboard services
- Complete inspection of all Hydro Vault electrical services
- Repair of any deficiencies uncovered during the required inspection